When a steel plate became lodged in a transfer chute it caused a tear in the conveyor belt that stretched more than 100 metres.
REMA TIP TOP’s rapid response maintenance team was mobilised to carry out a belt insert which was completed without incident in under 60 hours, minimising the downtime of one of this Pilbara port’s major conveyor systems.
For more information, download the whitepaper below.