Reducing cost and emissions for a mine operation using a virtual pipeline solution

Reducing cost and emissions for a mine operation

Labyrinth Resources needed power for a 5-month gold mining exploration project. Due to the remote location, there is no grid power available.

However, as this was only an exploratory phase it was a temporary operation and it wasn’t worth investing in building power lines to the site without knowing if it would be a long-term project.

The rising cost of diesel meant they needed an alternative, lower-cost source that could be easily set up. Temperatures in the region get as low as -30oC so any solution had to be able to cope with that.

Download the whitepaper using the form below to learn how the issue was resolved with Aggreko’s virtual pipeline solution. 