Dust suppression maintenance for a Tailings Storage Facility in the Hunter Valley occurred in December 2021.
The works, totalling 35 hectares, took our team two days to complete using Erizon’s specialised HydroTruck and a Cresco agricultural aircraft.
As with all projects undertaken at Erizon, an on- site inspection is the first step for a successful dust suppression project.
A survey drone was used to map the area in 3D to aid the planning of the aerial dust suppression application.
To read more, download the whitepaper below.